Factory

  • Passed the Certificate of Assessment of ISO 9001 quality assurance system in 2005
  • To implement lead free solder process since 2011
  • There are two SMT, a DIP and two PACK production lines, all production activities can be completed in the factory
  • Passed the certificate of UL, TUV in 2008
  • Research and development, professional SMT, DIP whole process manufacturing, high efficiency, quality, customer satisfaction, these are our expertise

Factories

Equipment

BMS Test Fixture

High Pot(ESS-2002)

DC ELECTRONIC LOAD

Hi-Power Pack

Digital Storage Ocilloscope

Fixture

Learning Equip

MIRAE 1010

MIRAE 1020P

DEK 265

CAMALOT 3800

Test Equip – BAT 620

© 2016 Copyright - DPC
- made by bouncin